What usually goes wrong
Most bathroom problems trace back to three shortcuts.
Rushed Waterproofing
Skipped curing time or inadequate slope leads to leakage and damp walls months later.
Disconnected Contractors
Plumber, tiler and carpenter working separately means nobody owns the finished result.
Layout Not Planned First
Fixtures chosen before the layout is finalised often leaves awkward, cramped spacing.
What's included
Planned and installed as one job.
Waterproofing
Membrane/coating systems applied before tiling, with proper drain slope and curing time.
Tiling
Floor and wall tiling in your choice of material, laid to the finalised fixture layout.
Sanitaryware & Fixtures
WC, washbasin, shower and fittings selected and fitted to fit your space and budget.
Custom Vanity & Storage
Solid-wood or moisture-resistant vanities built to your exact counter and storage needs.
Lighting
Task and ambient lighting planned around the mirror and shower zones.
Project Management
One team managing plumbing, electrical, tiling and carpentry sequencing.
See your bathroom's cost
Before you book a call.
Tell us your tiling area, fixture selection, waterproofing needs and finish grade for a live planning estimate.
Open Calculator →Our process
From assessment to a finished bathroom.
Discovery Call
We understand your layout, fixture preferences, budget and timeline.
Design & Layout
Fixture layout and material boards finalised before any work begins.
Material Selection
Choose tiles, sanitaryware and vanity finish from curated options.
Waterproofing & Build
Waterproofing, tiling and fixture installation, sequenced and supervised.
Final Fit & Handover
Vanity install, fittings check and a walkthrough before handover.
Questions
Bathroom renovation, answered.
What's included in a bathroom renovation with EnaraCraft?
Waterproofing, tiling, sanitaryware and fixture selection and fitting, custom vanity/storage, and lighting — planned and managed as a single job rather than separate contractors.
How much does a bathroom renovation cost?
It depends on area, fixture grade and waterproofing scope. Use our free Bathroom Calculator for an instant planning estimate, confirmed after a consultation.
How do you handle waterproofing?
We waterproof before any tiling begins, using membrane or coating systems appropriate to the area, with adequate slope to the drain and a curing period before tiling starts.
How long does a full bathroom renovation take?
Typically 2–4 weeks per bathroom, depending on scope and material availability.
Can you renovate one bathroom while the rest of the house is occupied?
Yes — we plan work sequencing and dust/water containment so the rest of the home stays usable.
Do you supply the tiles and fixtures, or do I choose my own?
Both options work. We can curate a palette for you, or fit fixtures and tiles you've already purchased.
Plan your bathroom
Let's fix it properly, once.
Share your bathroom details below, or try the calculator first for an instant estimate.